The history of the cable car company

 

Year Happening
1937 Construction Galzigbahn
1952 Construction St. Christophbahn
1955 Construction Vallugabahn
Construction DSB Kapallbahn
1957 Construction draglift Brunnenkopf St. Christoph
1957 Construction Feldherrnhügellift Galzig
1958 Construction draglift Maiensee II
1958 Rebuilding St. Christophbahn
1964 Rebuilding Galzigbahn
Construction draglift St. Jakob
1969 Construction Tanzbodenlift
Construction Vallugalift
1972 Construction Arlberg-Kandaharbahn
1975 Construction Rendlbahn
1980 Construction Valfagehrbahn
Construction DSB Zammermoos
1988 Construction Mattunbahn
  ConstructionRiffelbahn I and II
  ConstructionÜbungslift Gampen II
1990 Construction linkable 4-seater:
Gampenbahn
Zammermoosbahn
1995 Construction linkable 4-seater with bubbles:
Osthangbahn
St. Christophbahn
1998 Construction linkable 6-seater: Kapallbahn
1998 Contruction reservoir pool Arlensattel 80.000m³
1999 Construction linkable 4-seater: Fangbahn
2000 Construction 8EUB Nassereinbahn
2003 Construction linkable 6-seater with bubbles:
Gampbergbahn
Arlenmähderbahn
2005 Construction linkable 6-seater
with bubbles and seat heating: Valfagehrbahn
2006 Construction Funitel Galzigbahn with giant wheel
2009 Construction 8EUB Rendlbahn